Project Description: |
|
Located at the Trinidad Correctional Facility (TCF), 21000 HWY 350 East Model, CO 81059, northeast of Trinidad, CO, the TCF HW Heat Exchanger Valves project consists of selective demolition, installation of ten (10) 2” 3-way Hot Water Control Valves, with temperature controllers, integration with existing pneumatic controls, electrical connections, etc. required for a fully functional system.
MANDATORY PRE-BID MEETING: A meeting will be held Tuesday, April 29, 2014 at 10:00 AM at the TCF facility. Each prospective Bidder/Contractor shall inspect the work site in order to provide the proposed complete scope of work referenced under Response Instructions below. Attendees must complete, sign and submit a Consent to Search Authorization and Guest Registration to the Point of Contact listed below and Dave Sligar/TCF Physical Plant Manager (david.sligar@state.co.us) not later than 4:00 PM on April 25, 2014. Prospective Bidder/Contractors will meet at the TCF Entrance Building. Contact the Point of Contact below for more information.
BID NOTIFICATION FIRMS PLEASE NOTE: There are no additional plans or specifications beyond what has been published herein; nor is there any list of planholders or bidders that exists with respect to this solicitation. This Notice has been published on the Colorado Construction and Design Notices web site: https://www.bidscolorado.com , select “By Agency” filter for Department of Corrections. Bidders shall be solely responsible for checking this web site for all information that has been made available concerning this Notice. |